Court Theatre - Christchurch Performing Arts Precinct
YMCA Papa Hou, Christchurch CBD
Opuke Thermal Pools & Spa, Methven
The Piano: Centre for Music and the Arts, Performing Arts Precinct, Christchurch CBD
Cathedral Grammar Junior School, Christchurch
Te Raekura Redcliffs, Oakland, Bromley, Mt Pleasant, Russley, Somerfield Primary Schools, Christchurch
The Hornby Centre, Christchurch
NZ Blood Service Building, Christchurch
New Brighton Surf Lifesaving Club, Christchurch
South Brighton Surf Lifesaving Club, Christchurch
Cashmere High Sports Facility, Christchurch
Te Rauhitanga - Manaaki Whenua Landcare Research, Lincoln
St Patrick’s Catholic Church, Lincoln
Cathedral Grammar Classroom Block, Christchurch
Don Beaven Medical Research Centre, 40 Stewart Street, Christchurch
Russley Primary School Hall and Multi-purpose Facility, Christchurch
Russley Village - Blocks A, B, C, D, E, F, Christchurch
Mt Pleasant School Redevelopment, Christchurch
Angus Tait Building Strengthening, University of Canterbury, Christchurch
Bishop Julius New Accommodation Block & Miscellaneous Seismic Strengthening, University of Canterbury, Christchurch
Ūkaipō – Rangitāne Culture Centre, Blenheim
Wesley Care Resthome - Stages 1 and 2, Harewood Road, Christchurch
Beat Box, Art Box, Hospitality and Office Modules, Christchurch CBD
St Mary's Catholic Church New Brighton, Christchurch
Hagley Oval Light Towers, Christchurch
Rhodes Park Community Centre, Tai Tapu, Christchurch
North Avon Medical Centre, Christchurch
Manchester Street Superstop, Christchurch CBD
Consular Office of Japan, Christchurch CBD
Holy Trinity Church, Christchurch
Grow Active Daycare, Welles Street, Christchurch CBD
Student Services Building Strengthening, University of Canterbury, Christchurch
Christchurch Art Gallery Base-Isolation Retrofit Project
Transpower Extensions, Gilberthorpes Road, Christchurch
Court Theatre - Christchurch Performing Arts Precinct

Project Cost: $55M

Architect: Athfield Architects / Haworth Tompkins UK

Project Director: Julian Ramsay

Project Description:

World-class $55M performing arts facility incorporating two theatres, front and back of house facilities. Structural features include strong sustainability focus with extensive use of timber relevelable foundation slab system.

YMCA Papa Hou, Christchurch CBD

Project Cost: $45M

Architect: Architectus

Project Director: Julian Ramsay

Project Description:

YMCA Papa Hou is in a high profile CBD location. Project incorporates new mixed-use facility for theatre, education, health & fitness, and community space, as well as the strengthening of an existing seven-storey accommodation block.

Opuke Thermal Pools & Spa, Methven

Project Cost: $15M

Architect: Sheppard & Rout

Project Director: Cameron MacPherson

Project Description:

Situated in the rapidly regenerating town of Methven below the slopes of Mt Hutt, this project features an impressive large-span two-way exposed LVL roof structure, extensive precast feature walls, outdoor hot pools with crazy river, diving pool, cave structures, and bar facilities.

The Piano: Centre for Music and the Arts, Performing Arts Precinct, Christchurch CBD

Project Cost: $17M

Architect: Wilkie + Bruce Architects Ltd

Project Director: Julian Ramsay

Project Description:

Set in the heart of the Christchurch CBD, this set of buildings contain world-class facilities for music, including a 350 seat auditorium and a three-storey teaching block. Both buildings share a common ground-floor podium structure.

Structural features of this building include an innovative re-levelable slab foundation system with cast-in services on top of a gravel raft, acid-washed exposed charcoal finished precast concrete panels, large open auditorium areas, glazed facades, and the use of concrete filled steel columns to eliminate the need for intumescent painted fire rating where columns are exposed to view.

Cathedral Grammar Junior School, Christchurch

Project Cost: $3M

Architect: Tezuka Architects & Andrew Barrie (TA+ABL)

Project Director: Grant Wilkinson

Project Description:

This building structure comprises a fully interlocking CNC cut LVL timber structure which arrived on site ready to assemble. The LVL frames were meticulously designed and manufactured to ±0.5mm accuracy to ensure perfect fit and structural performance. This construction technique is likely a first for New Zealand and certainly for Christchurch, and the building is a showcase for engineering, carpentry and craftsmanship.

The Junior School design is a Japanese concept consisting of seven classrooms, a common room, office, and amenities, all arranged around a central courtyard. There is a large roof deck with a slide down to the ground.

The project attracted a lot of positive attention from passers-by during construction, and in turn the contractors all thoroughly enjoyed working on the building. 

Ruamoko Solutions won a Merit Award at the 2016 ACENZ Innovate NZ Award of Excellence for their work on this project, and the project won a Craftsmanship Award at the ArchitectureNow Interior Awards 2016.

Te Raekura Redcliffs, Oakland, Bromley, Mt Pleasant, Russley, Somerfield Primary Schools, Christchurch

Project Description:

As a MoE Panel member, Ruamoko Solutions has completed designs for a combined $32M worth of education facilities including new multi-purpose teaching facilities, gymnasiums, libraries and classrooms in line with ILE principles, and construction of a new multi-use space in timber portal frames.

Te Raekura Redcliffs School project won an SCNZ Excellence in Steel Award in 2020, and won the Supreme Award, National Category Award, Gold Award and Value Award at the 2021 NZ Commercial Project Awards.

The Hornby Centre, Christchurch

Project Cost: $30M

Architect: Warren & Mahoney

Project Director: Cameron MacPherson

Project Description:

Large scale community development for southwest Christchurch featuring aquatic centre including 25m pool, learn-to-swim pool, kids recreational pool and spa facilities, community activities areas, and large library space around integrated outdoor courtyard areas.

The site is on an historic landfill on a quarry, and features extensive deep piling. The project features multiple structural forms to suit the spaces.

NZ Blood Service Building, Christchurch

Project Cost: $15M

Architect: Wilkie + Bruce Architects Ltd

Project Director: Grant Wilkinson

Project Description:

This prominent building in central Christchurch sits adjacent to the Blenheim Road overpass and Moorhouse Avenue intersection.

Due for completion in August 2014, this highly serviced building features innovative sub-slab tension tie-downs to provide economical foundations by using weight of the gravel raft to prevent large conventional foundations above the raft. 

This project won a  Gold Award at the 2015 New Zealand Commercial Project Awards. The awards are an annual celebration of excellence in commercial construction. In addition, the building won a Judges Choice Award at the 2015 Property Council NZ Southern Excellence awards, and was a finalist in the 2015 ACENZ Innovate NZ Awards of Excellence (click here for more information).

New Brighton Surf Lifesaving Club, Christchurch

Architect: South by Southeast

Project Director: Julian Ramsay

Project Description:

Sited right next to the ocean, durability was a key consideration for this project – a balancing act between architectural design, maintenance and structural performance of the building materials over the building’s design life.

Construction generally consists of concrete blockwork the ground floor, and lightweight timber to the first floor and roof. The building features large decks, expansive glazing and Acoya Acetylated Timber cladding, which has a 50 year durability guarantee.

South Brighton Surf Lifesaving Club, Christchurch

Project Cost: $2.5M

Architect: Sheppard & Rout Architects Ltd

Project Director: Cameron MacPherson

Project Description:

$2.5M two-storey surf club redevelopment set in sand dunes on original surf club site. Construction generally consists of concrete blockwork to the ground floor and lightweight timber framed structure for the first floor and roof, and a concrete mid-floor with timber decking.

Designing for durability formed a key part of the project – finding the balance of architectural design with maintenance and structural performance of the building materials over the building’s design life.

Cashmere High Sports Facility, Christchurch

Project Cost: $3M

Architect: Ian Krause Architects Ltd

Project Director: Julian Ramsay

Project Description:

This building was completed just before the recent Canterbury earthquakes. Ruamoko Solutions proposed that given the high liquefaction potential in the area, this building incorporated a lightweight re-levelable floor on a gravel raft. While the surrounding area experienced significant surface liquefaction in the earthquakes, the building was able to be immediately used  and proved to be a successful facility for the school. Other innovations were sub-slab tie downs to make use of the weight of the gravel raft to minimise foundation size, and precast foundations which allowed for rapid construction.

The building features a netball court, several basketball courts, grandstand facilities and changing and learning areas.

Te Rauhitanga - Manaaki Whenua Landcare Research, Lincoln

Project Cost: $15M

Architect: Warren & Mahoney

Project Director: Cameron MacPherson

Project Description:

New development for Manaaki Whenua Landcare Research at their Lincoln Campus, featuring new offices, research facilities, meeting areas and public entry.

St Patrick’s Catholic Church, Lincoln

Project Cost: $3M

Architect: WSP Opus

Project Director: Grant Wilkinson

Project Description:

Opened in May 2019, the new St Patrick’s Catholic Church occupies a prominent corner site in the centre of the Lincoln township. The church has been re-built on the same site as the original church, which suffered significant damage as a result of the Canterbury earthquakes. The new church has been constructed as an Importance Level 3 and Greenstar rated building, and provides a fantastic new facility for Lincoln and the surrounding areas.

The church is constructed in a traditional shape and form, featuring internally exposed glulam timber trusses and columns supporting a vaulted ceiling through the main space, and a polished concrete floor throughout. Ruamoko Solutions worked closely with the architects to ensure that the structural systems for the building integrated smoothly with the architecture, supporting features such as the regular tall windows on all elevations, and illuminated feature steelwork on the exterior, while not compromising on the resilience of the structure.

This project won the 2020 NZ Wood Design Awards in the Public Design category.

Cathedral Grammar Classroom Block, Christchurch

Architect: Warren and Mahoney Architects

Project Director: Cameron MacPherson

Project Description:

New classroom block for The Cathedral Grammar School in central Christchurch. The development includes 8 new classrooms over two-storeys, additional shared teaching and break-out spaces. Construction comprises of precast concrete and suspended concrete flooring, a feature colonnade concrete structure at ground floor, lightweight first floor and brick cladding. Foundations are deep steel screw piling to suit liquefiable soils on site.

Don Beaven Medical Research Centre, 40 Stewart Street, Christchurch

Project Cost: $2.5M

Architect: Richard Proko Ltd

Project Director: Cameron MacPherson

Project Description:

This medical research facility is a three-storey commercial building completed in 2010. Designed before the Canterbury earthquakes, the building performed well and remained fully functional throughout the earthquake sequence. The facility was officially opened in September 2011 by Prime Minister John Key and includes a centre of excellence to study diabetes in New Zealand. Construction is of ductile concrete frames with concrete rib & infill and unispan flooring, precast concrete walls and roof level steel portal frames.

Russley Primary School Hall and Multi-purpose Facility, Christchurch

Project Cost: $2.5M

Architect: Ian Krause Architects Ltd

Project Director: Julian Ramsay

Project Description:

This project consists of an assembly hall and multi-purpose rooms spread over a 1,000 square metre footprint. Construction included structural steel portal frames, concrete block, and conventional foundations. The facility has been highly successful and a welcome addition to the school and its community.

Russley Village - Blocks A, B, C, D, E, F, Christchurch

Project Cost: $50M (total)

Architect: Dalman Architecture Ltd, ASC Architects

Project Director: Grant Wilkinson

Project Description:

Ruamoko Solutions has a long history of work on this project, having completed six large blocks of retirement accommodation with a combined value of approximately $50 million. 

Ruamoko Solutions is continuing work on this exciting project that provides a positive retirement experience for its residents. 

Mt Pleasant School Redevelopment, Christchurch

Project Cost: $2.5M

Architect: Wilkie + Bruce Architects Ltd

Project Director: Cameron MacPherson

Project Description:

Ruamoko Solutions carried out the structural design for three new school buildings at Mt Pleasant School. The buildings included 10 classrooms, shared rooms and amenities, a new administration block, offices, staff room, and library. The single-storey construction was of precast panel end walls, steel portal and cantilever post design for seismic loads, lightweight timber bracing, steel roof rafters and ‘doughnut’ shaped ceiling bracing diaphragms.

Angus Tait Building Strengthening, University of Canterbury, Christchurch

Project Cost: $2.5M

Architect: Warren & Mahoney

Project Director: Julian Ramsay

Project Description:

Following the successful work carried out by Ruamoko Solutions on the Primary Data Centre at the University of Canterbury, they were then commissioned to strengthen to Importance Level 3 (IL3) the oldest building on the Ilam Campus to serve as the secondary Data Centre. This strengthening required innovative approaches such as "horseshoe" clips to frames, and tanked subterranean foundation beams to spread seismic load to existing piles. These strengthening methods were successfully implemented to so they were minimally intrusive to this iconic building which was one of the first on campus to be strengthened post-earthquake.

This building won an award in the Heritage Category at the 2015 New Zealand Institute of Architects Awards, and won a Merit Award at the 2016 ACENZ Innovate NZ Award of Excellence.

Bishop Julius New Accommodation Block & Miscellaneous Seismic Strengthening, University of Canterbury, Christchurch

Project Cost: $6M (total)

Architect: Wilkie + Bruce Architects Ltd

Project Director: Grant Wilkinson

Project Description:

Ruamoko Solutions has been involved with the Bishop Julius Hall at the University of Canterbury campus on several projects, including a new sixty-bedroom accommodation block, as well as the earthquake strengthening of the five-storey Nancy Simms block and three-storey Mabel Hendrie block. Strengthening of the Nancy Simms block included an innovative combination of a coupled wall pair with attached eccentrically braced frame coupling element.

Ūkaipō – Rangitāne Culture Centre, Blenheim

Project Cost: $2.5M

Architect: Wilkie + Bruce Architects Ltd

Project Director: Cameron MacPherson

Project Description:

The Rangitāne Culture Centre replaces a former community hall in Grovetown just outside Blenheim. The building contains a large hall, commercial kitchen, and meeting rooms that can be used to sleep large groups attending cultural events. Construction is of precast concrete, lightweight braced walls, feature LVL portal frames and structural steelwork. It was a a New Zealand Institute of Architects Award Winner in 2011.

Wesley Care Resthome - Stages 1 and 2, Harewood Road, Christchurch

Project Cost: $12M

Architect: Foley Group Architecture

Project Director: Julian Ramsay

Project Description:

This large two-storey retirement accommodation includes residential living, administration and community facilities, chapel areas and amenities.

Stage 1 was built carefully around the existing four-storey block, and stage 2 replaced the old four-storey block that was demolished.

Beat Box, Art Box, Hospitality and Office Modules, Christchurch CBD

Designer: F3 Design Ltd, Field Architecture

Project Director: Grant Wilkinson

Project Description:

Ruamoko Solutions has worked closely with F3 Design Ltd and Field Architecture to develop a series of re-usable, modular spaces that can be configured for a large range of various uses. These modules have been installed for various art, music, hospitality and office functions in the Christchurch CBD. The modules have provided temporary spaces that have been an essential part of maintaining activities in Christchurch city following the Canterbury earthquakes. They have allowed useful spaces to be quickly installed on sites where buildings have been demolished.

The image above shows an variation of the modules that provides a unique sound chamber. This innovative structure consists of a two-way catenary steel grid supporting plywood anechoic baffles which also provide permanent formwork for a concrete roof. 

St Mary's Catholic Church New Brighton, Christchurch

Project Cost: $2M

Architect: Foley Group Architecture

Project Director: Julian Ramsay

Project Description:

Opened by the Catholic Bishop of Christchurch in March 2018, this was the first catholic church to be rebuilt following the Canterbury earthquakes, and serves as a focal point for the community of the hard hit eastern suburbs of Christchurch.

Construction features include an innovative re-levelable raft foundation, concrete panels to clerestory windows, and a unique coved roof structure.

Project won a Silver Award at the 2019 NZ Commercial Project Awards.

Hagley Oval Light Towers, Christchurch

Project Cost: $5M

Architect: Athfield Architects Ltd

Project Director: Julian Ramsay

Project Description:

Ruamoko Solutions were engaged for the foundation design and structural peer-review of the Musco light towers on this exciting project.

Project consists of six state-of-the-art LED light towers, each 45m tall, supported on concrete plinth foundations anchored with steel screw-piles.

Project to be delivered in time for the opening of the 2021 Women’s Cricket World Cup.

Rhodes Park Community Centre, Tai Tapu, Christchurch

Project Cost: $4.6M

Architect: Foley Group Architecture

Project Director: Julian Ramsay

Project Description:

This multi-purpose facility is a result of close collaboration with local community groups, and serves as the hub of the Tai Tapu community.

The facility features community rooms, kitchen and bar facilities, changing rooms, public toilets, a large roofed outdoor courtyard, and is the home of the Waihora Rugby Club.

North Avon Medical Centre, Christchurch

Architect: Ikon

Project Director: Julian Ramsay

Project Description:

This facility is set in scenic surroundings adjacent the Avon River. Design challenges included TC3 ground conditions requiring screw-piles and a suspended ground floor.

Patients frequently report how thrilled they are with this new facility in the recently re-build Dallington area that was hit hard by the Canterbury earthquakes.

Manchester Street Superstop, Christchurch CBD

Architect: Wilkie + Bruce Architects Ltd

Project Director: Julian Ramsay

Project Description:

The post-earthquake rebuild of Christchurch’s CBD has had a strong “accessible city” focus on transport options such as public transport and cycleways. Ruamoko Solutions were engaged by Otakaro Ltd (formerly CERA) to provide structural engineering services for this unique project.

The project has several complexities such as bridging existing services, poor ground conditions, and the requirement to keep a busy road operating during construction.

Consular Office of Japan, Christchurch CBD

Architect: Sheppard & Rout

Project Director: Cameron MacPherson

Project Description:

Completed in 2022, this bespoke building for the Japanese Consulate features heavy precast concrete construction, and features a number of innovative features to suit the buildings unique use.

Holy Trinity Church, Christchurch

Architect: Tennent Brown

Project Director: Cameron MacPherson

Project Description:

This project sympathetically replaces the controversially demolished Holy Trinity church designed by Benjamin Mountfort. The design reuses salvaged materials from the original church and is constructed in structural steel and precast concrete with numerous nods to the original design.

Grow Active Daycare, Welles Street, Christchurch CBD

Project Cost: $3M

Architect: Three Sixty Architecture

Project Director: Julian Ramsay

Project Description:

To meet an increasing demand for early education facilities within the Christchurch CBD, this project involved the strengthening of an existing industrial warehouse, and the addition of adjacent buildings to form a combined preschool and daycare facility.

Strengthening of the existing building was to 100% of current building code at IL3, and the extension consisted of a reinforced concrete block structure with steel frames. Foundations were carefully considered to match performance between old and new in a pragmatic fashion.

Student Services Building Strengthening, University of Canterbury, Christchurch

Project Cost: $2.5M

Architect: Warren & Mahoney

Project Director: Cameron MacPherson

Project Description:

Ruamoko Solutions was engaged to seismically assess and strengthen the two-storey former physical sciences library at the University of Canterbury. As part of a larger refurbishment of the building, it was decided to strengthen the building in two phases, the low-strength ground floor columns and the remaining structure.

The innovative and  cost-effective solution to strengthen the ground floor columns used a glass fibre wrap (Fibre Reinforced Polymer or FRP) around the tops and bottoms of the columns to increase the ductility available to the columns, and therefore increase the building’s resilience. The work was completed days prior to the September 2010 earthquake. Flexural cracking of fibres at the tops and bottoms of the columns was observed,  confirming that the strengthening had performed  well and had significantly reduced damage to the building. Following the successful FRP strengthening, the remainder of the building and level 2 link bridge to another building was strengthened as part of building alterations and refurbishment.

Christchurch Art Gallery Base-Isolation Retrofit Project

Project Cost: $30M

Client: Fulton Hogan Ltd

Project Director: Grant Wilkinson, Cameron MacPherson

Project Description:

Ruamoko Solutions was chosen by contractor Fulton Hogan as structural design engineers on one of the largest and most complex projects completed by Ruamoko to date - the seismic retrofit of the landmark Christchurch Art Gallery building with base isolators.

The project involved the installation of 140 triple-curvature friction pendulum bearings below the ground floor of the existing Art Gallery Building. These base isolation bearings significantly reduce the seismic actions transferred to the building in an earthquake, greatly improving the expected performance of the building and its valuable artwork in earthquakes.

The base isolation design ensures that the building can move up to 550mm in each direction during a large earthquake. The actions from the isolators, including the large eccentricities, induce significant actions on the existing structure different to its original design. The retrofit covered a wide range of column strengthening, beam strengthening, wall strengthening, seismic joint rattle spaces, cover plates, suspended lifts and stairs and many other unique aspects. Together with the tight timeframe and construction constraints, the project provided many structural challenges for the Ruamoko Solutions team and required a high level of innovation and specialist knowledge.

Ruamoko Solutions won a Silver Award at the 2016 ACENZ Innovate NZ Award of Excellence for their work on this project.

Grant Wilkinson was project director for the original construction of the Christchurch Art Gallery project whilst a director at Holmes Consulting Group in 2003.

Transpower Extensions, Gilberthorpes Road, Christchurch

Project Cost: $2.5M

Architect: Dalman Architecture Ltd

Project Director: Grant Wilkinson

Project Description:

Single-storey office structure, featuring long span LVL portal frames. Structural features include novel portal frame knee joint detailing, feature precast panels, and a light steel roof.